A
Aangan Studio
AI Receptionist
SupabaseTelegram connectedVaani webhook enabled
← All call records

Unnamed caller

8 Sept, 9:44 am IST · Case transcript T07

UnqualifiedDemo seed
Demo seed record: a case transcript replayed through the AI rules. This was not an AI-handled phone call.

Summary

Declined: Unnamed caller. Needs completion in 3 weeks, which is under the 6-week minimum lead time (services.md).

Caller & project details

Caller
Not given
Phone
Not given
Caller type
New enquiry
Project type
Residential — partial (2+ rooms / floor)
Carpet area
Not stated
Location
Not stated
Timeline
Before Diwali (~3 weeks)
Budget (volunteered)
Not mentioned
Decision-maker
Not confirmed
Asked about pricing
No
Duration
3m 15s
Cost
₹14.00 (estimated)

Qualification criteria

The five criteria from qualified.md

  • Real design + execution project✓ Pass

    Residential — partial (2+ rooms / floor) with execution.

  • In service area (Pune / PCMC)? Unclear

    Location not stated.

  • Realistic timeline✕ Fail

    Needs completion in 3 weeks, which is under the 6-week minimum lead time (services.md).

  • Budget broadly aligned (volunteered only)✓ Pass

    Budget not mentioned, so treated as qualified (qualified.md). Not probed.

  • Decision-maker on call (or authorised)? Unclear

    Not confirmed. Treated as qualified and noted for the designer (qualified.md: don't push).

What the receptionist says

Generated reply, checked by the pricing guard so it never contains a figure.

Thank you for calling. Our design phase alone takes 3–4 weeks, and execution takes 8–16 weeks, so we can't take on a project that needs to be ready in under six weeks without rushing it. If your timeline moves, we'd love to hear from you.

Human handoff

Not required

No handoff needed for this outcome.

Transcript summary (from case data)

Wants living room and kitchen redone before Diwali (~3 weeks away). Asked about doing just the living room. Will think about starting after Diwali.